M25 | ||||
---|---|---|---|---|
London Orbital Motorway | ||||
Route information | ||||
Part of E15 and E30[1] | ||||
Maintained by Connect Plus (contracted to National Highways) | ||||
Length | 188 km (117 mi) | |||
Existed | 1975–present | |||
History | Opened: 1975 Completed: 1986 | |||
Major junctions | ||||
Orbital around London (in conjunction with the A282) | ||||
Anti-clockwise end | Dartford (Dartford Crossing southern approach) | |||
J3 → M20 motorway J5 → M26 motorway J7 → M23 motorway J12 → M3 motorway J15 → M4 motorway J16 → M40 motorway J21 → M1 motorway J23 → A1(M) motorway J27 → M11 motorway | ||||
Clockwise end | Thurrock (Dartford Crossing northern approach) | |||
Location | ||||
Country | United Kingdom | |||
Counties | Kent, Surrey, Berkshire, Greater London, Buckinghamshire, Hertfordshire, Essex | |||
Primary destinations | London Dartford Crossing Sevenoaks Gatwick Airport Heathrow Airport Watford Stansted Airport Brentwood Chelmsford Ilford Romford | |||
Road network | ||||
|
The M25 or London Orbital Motorway is a major road encircling most of Greater London. The 117-mile-long (188 km) motorway is one of the most important roads in the UK and one of the busiest. Margaret Thatcher opened the final section in 1986, making the M25 the longest ring road in Europe upon opening.[a] The Dartford Crossing completes the orbital route but is not classed as motorway; it is classed as a trunk road and designated as the A282. In some cases, including notable legal contexts such as the Communications Act 2003, the M25 is used as a de facto alternative boundary for Greater London.
In the 1944 Greater London Plan, Patrick Abercrombie proposed an orbital motorway around London. This evolved into the London Ringways project in the early 1960s, and by 1966, planning had started on two projects, Ringway 3 to the north and Ringway 4 to the south. By the time the first sections opened in 1975, it was decided the ringways would be combined into a single orbital motorway. The M25 was one of the first motorway projects to consider environmental concerns and almost 40 public inquiries took place. The road was built as planned despite some protests that included the section over the North Downs and around Epping Forest which required an extension of the Bell Common Tunnel.
Although the M25 was popular during construction, it quickly became apparent that there was insufficient traffic capacity. Because of the public inquiries, several junctions merely served local roads where office and retail developments were built, attracting even more traffic onto the M25 than it was designed for. The congestion has led to traffic management schemes that include variable speed limit and smart motorway. Since opening, the M25 has been progressively widened, particularly near Heathrow Airport.
Cite error: There are <ref group=lower-alpha>
tags or {{efn}}
templates on this page, but the references will not show without a {{reflist|group=lower-alpha}}
template or {{notelist}}
template (see the help page).